Design & Build of RCC Pre-Stressed Motorable Bridge

Site Location : Kamalamai Municipality, Sindhuli

Works:

  1. Detailed Engineering Survey
  2. Soil Investigation
  3. Detailed Design of Bridge
  4. Foundation
  5. Sub-Structure
  6. Super-Structure
  7. River Training and Approach Road